UK-Glasgow: Cooling and ventilation equipment.
Offshore Renewable Energy Catapult
Contracting authority
- Contracting authority:
- ORE Catapult
- Public Procurement Organisation Number:
- PYJB-8958-TLYW
- Address:
121 George Street
Glasgow
G1 1RD
UK- Contact name:
- Rachel Douglas
- Email:
- procurement@ore.catapult.org.uk
- Telephone:
- Not provided
- Website:
- https://www.delta-esourcing.com/
- Organisation type:
- BODY_PUBLIC
- Devolved regulations that apply:
- None
Procedure
- Procedure type:
Direct award
Scope
- Title:
- Cooling Equipment Decommissioning
- Reference number:
- ORE/26/060
- Description:
- The purpose of this direct award is to appoint Aqua Cooling Ltd to decommission existing cooling systems for the test rig and ancillary equipment in preparation for the planned upgrade of the 15MW facility.
Participation
- Suitable for SMEs:
- No
- Suitable for VCSEs:
- No
Lots
- Description:
- Not provided
- Main procurement category:
- SUPPLIES
- Above threshold:
- Yes
- Suitable for SMEs:
- No
- Suitable for VCSEs:
- No
- Contract dates (estimated):
- 13/10/2026 to 18/12/2026
- CPV classifications:
42500000 - Cooling and ventilation equipment.- Contract can be extended:
- No
- Delivery regions:
UKC21 - Northumberland
Suppliers
Lot 1
- Title:
- Not provided
- Supplier:
- Aqua Cooling Limited
- Companies House:
- PMXP-9195-PLHV
- Address:
Unit 6 Brickfield Lane, Chandler's Ford Industrial Estate, Eastleigh
Hampshire
SO534DP
UK- Email:
- thain.aiken@aquacooling.co.uk
- Telephone:
- 07788313262
- Small or medium-sized enterprise (SME):
- No
- Voluntary, community or social enterprise (VCSE):
- No
- Supported employment provider:
- No
- Public service mutual:
- No
Documents
- Associated tender documents:
Not provided- Technical specifications:
Not provided
Contract Terms
- Contract terms:
- Not provided
- A conflicts assessment has been prepared and revised:
- Yes
Direct Award Justification
- Allowed by statutory instrument:
- No
- Direct award justifications:
Single supplier - intellectual property- Justification description:
- This is the only option because Aqua Cooling designed and installed the existing system and holds the original design and installation information.
- Special regime:
None
Other organisations
Not provided